
Our Projects
Reinforcement projects across NSW and the ACT: motorway tunnels, metro stations, bridges and water infrastructure. Each one lists the structures, the crew and the dates, so you can see what we have fixed before you send us a package.
4.3 Google reviewsMotorways and tunnels
M6 Motorway Stage 1
2,000+ tonnes fixed across cut-and-cover structures and tunnel works.

WestConnex M4-M5 Link & St Peters Interchange
Road slabs, capping beams, retaining walls and barriers with up to 12 fixers.

NorthConnex Tunnel
Detention basins, cross passages, capping beams, retaining walls and bridges.
Rail, roads and bridges

Sydney Metro City & Southwest Stations
Four stations, multiple crews of 6 to 14 fixers.
Sydney Metro West: Unwin St Overpass & A'Becketts Creek Bridge
Two bridge structures for Sydney Metro West at Clyde, 2023.

Bringelly Road Upgrade: Upper Canal Bridge
New bridge over the Upper Canal. Crew of 6, completed July 2018.
Northern Beaches Hospital Road Upgrade
All reinforcement for three underpass bridges at Frenchs Forest.
Water infrastructure
What these jobs have in common
Most of this work is civil infrastructure delivered under a head contractor: heavy reinforcement on a fixed pour programme, with engineers inspecting every cage before the concrete arrives. The structures repeat from job to job. Capping beams on WestConnex and NorthConnex, cut-and-cover slabs on WestConnex and the M6, bridge reinforcement at Bringelly, Frenchs Forest and Clyde, and water-retaining concrete at West Camden and Isabella Weir.
If your package has any of those structures in it, send the drawings through and we will price it by the tonne, hour or lineal metre. See steel fixing, formwork and welding for how we run each trade.
Send us the drawings.
We price each package by the tonne, hour or lineal metre, to suit the job.
