Since 2016

Our Projects

Reinforcement projects across NSW and the ACT: motorway tunnels, metro stations, bridges and water infrastructure. Each one lists the structures, the crew and the dates, so you can see what we have fixed before you send us a package.

4.3 Google reviews
2,000+ tFixed on M6 Stage 1
9Projects listed
6 to 14Fixers per crew
NSW + ACTWhere we work

Motorways and tunnels

Rail, roads and bridges

Water infrastructure

What these jobs have in common

Most of this work is civil infrastructure delivered under a head contractor: heavy reinforcement on a fixed pour programme, with engineers inspecting every cage before the concrete arrives. The structures repeat from job to job. Capping beams on WestConnex and NorthConnex, cut-and-cover slabs on WestConnex and the M6, bridge reinforcement at Bringelly, Frenchs Forest and Clyde, and water-retaining concrete at West Camden and Isabella Weir.

If your package has any of those structures in it, send the drawings through and we will price it by the tonne, hour or lineal metre. See steel fixing, formwork and welding for how we run each trade.

Send us the drawings.

We price each package by the tonne, hour or lineal metre, to suit the job.

Call Get a quote