Over 2,000 tonnes of reinforcement fixed since 2021. The crew has been on M6 Stage 1 since 2021, across both the cut-and-cover and tunnel sections.
The project
M6 Stage 1 is a pair of 4 km tunnels connecting the M8 at Arncliffe to President Avenue in Kogarah. It is one of the main links in southern Sydney’s motorway network, taking through traffic underground and off local roads.
Our scope
We fix reinforcement in two areas of the job:
- Cut-and-cover structures. Open-excavation sections that are built, roofed over and backfilled. The reinforcement goes into the base slabs, walls and roof slabs, often with heavy bar and dense laps where the box meets the driven tunnel.
- Tunnel works. Reinforcement for the in-tunnel concrete elements. CONFIRM: which tunnel elements (portals, invert slabs, cross passages, plant rooms)
Tonnage this size comes down to sequencing. Bar has to arrive in the right order for each pour, cages and mats have to be ready for the engineer’s inspection, and the crew has to keep pace with the formwork and concrete trades so the pour programme holds.
Key numbers
| Item | Detail |
|---|---|
| Steel fixed | 2,000+ tonnes |
| On site since | 2021 |
| Structure types | Cut-and-cover, tunnel |
| Peak crew | CONFIRM: peak crew size |
| Head contractor | CONFIRM: name, and permission to publish it |
Why it matters for your job
If your package is a cut-and-cover box, a portal or a heavily reinforced slab, we have recently fixed the same structures under motorway-programme pressure. See our steel fixing services for how we price and run a package.
Got a similar structure on your programme?
We price each package by the tonne, hour or lineal metre, to suit the job.