A major section of the reinforcement on a $146 million plant upgrade. JD Reinforcement started on Stage 3 of the West Camden Water Recycling Plant upgrade at Grasmere in July 2022.
The project
The government-funded Stage 3 upgrade increases wastewater treatment capacity at West Camden to keep up with population growth in Sydney’s south-west.
Our scope
We were contracted for a major section of the reinforcement works. CONFIRM: which structures (tanks, bioreactors, clarifiers, channels), approximate tonnage, crew size, completion date and head contractor
Water-retaining structures are a different discipline from road and tunnel work. Cover, lap lengths and bar spacing are set tightly to control cracking, waterstops and cast-in items have to be worked around the steel, and inspection before each pour is strict.
Why it matters for your job
If you are tendering on a treatment plant, reservoir or detention structure, we have fixed reinforcement on water-retaining concrete at plant scale. We have also worked on water infrastructure at Isabella Weir in Canberra, and on detention basins for NorthConnex.
Got a similar structure on your programme?